PICVs and hydronic balancing
Replacing 3-way and 2-way valves with PICVs on FCUs and AHUs so every unit holds its required flow. See the PICV page for how it works.
GrüntekENERGY SOLUTIONSSOLUTION · 03
HVAC retrofit, refurbishment and installation in live, occupied buildings such as hotels and office towers, phased to keep disruption to a minimum and handed over as a commissioned, working system.
WHAT WE DELIVER
HVAC retrofit, refurbishment and installation in live, occupied buildings such as hotels and office towers, phased to keep disruption to a minimum and handed over as a commissioned, working system.
Replacing 3-way and 2-way valves with PICVs on FCUs and AHUs so every unit holds its required flow. See the PICV page for how it works.
Replacement and refurbishment of AHUs, including modular units built in place where plant-room access is restricted.
Fouled or failed coils and VAV terminals replaced with correctly selected equipment and re-commissioned.
Variable-frequency drives on fans and pumps so equipment follows the load instead of running at fixed speed.
Pump sets and drives supplied and installed, sized to the network’s actual hydraulic profile, including conversion from constant to variable flow.
Calorifier replacement with water-source heat pumps for domestic hot water, plus heat-pump relocation and recommissioning.
Supply and installation of packaged air-conditioning plant and air curtains in operational hotels and commercial buildings.
RETROFIT READINESS CHECK
Answer six quick questions about your building to see how much retrofit opportunity there is and which measures we would look at first.
OCCUPIED BUILDINGS
Hotels, offices and residential towers cannot simply switch off. We plan every retrofit around the people using the building.
Work is split into zones so the rest of the building keeps its cooling while each section is done.
Where a section has to be isolated without draining the system, pipes can be frozen locally to form a temporary plug.
New connections can be made on live pipework, avoiding a shutdown where the application allows it.
When a short shutdown cannot be avoided, it is planned and agreed with facilities management in advance.
Noisy or critical activities can be scheduled at night or at weekends to suit the building.
BEFORE AND AFTER
Drag the handle to compare.


RELATED WORK
RetrofitCooling coils, blower refurbishment & VAV replacement
RetrofitModular AHU replacement & fan VFD upgrades
RetrofitChilled-water pump & ventilation VFD works
RetrofitWater-source heat pumps for hot-water calorifiers
OptimisationPICVs & HVAC energy-management controls
RetrofitPackaged air-conditioning upgrades
PRODUCTS & PLATFORMS

Upgrade air-handling and terminal equipment.
Product details
Equipment for pumping and fan systems.
Product details
Heat-pump supply, installation and relocation.
Product details

EC fans for ventilation and air-conditioning systems.
Product details

Turnkey air-curtain installation.
Product detailsComprehensive and non-comprehensive AMCs for chillers, condensing units, HVAC, ETS, BMS and metering.
FAQ
Yes, with minimal disruption. Work is phased floor by floor or zone by zone. Where a section has to be isolated we use techniques such as pipe freezing and hot tapping, and any short shutdown that cannot be avoided is agreed with facilities management in advance.
We are not tied to a single manufacturer. Equipment is selected for the application and the client’s specification, and handed over commissioned and documented.
Not always. Refurbishing or replacing the components that dominate consumption, such as coils, fans and drives, can restore performance and extend equipment life.